close
test_template

Hod Statement for Installation of Floor Tiles (ceramic, Porcelain & Agglomerate)

Human-Written
download print

About this sample

About this sample

close
Human-Written

Words: 846 |

Pages: 2|

5 min read

Published: Mar 1, 2019

Words: 846|Pages: 2|5 min read

Published: Mar 1, 2019

Equipment needed:

  • Drum mixer
  • Grinder
  • Aluminum straight edge
  • Trowel
  • Plumb
  • Spirit level
  • Wheel barrow
  • Hand shovel
  • Water tank
  • Right Angel
  • Elastic hammer

Material Delivery, Storage and Handling:

  • Only materials that approved will be utilized as a part of execution of tiling works.
  • Handling, delivery and storage of tiles, adhesives and cementatious / grout materials will keep in a manners in accordance with assure no discoloration and damages happens.
  • Tile consignments should be remain stacked in clusters together with respect to type, colour, shape, thickness and form. Tiles from various batches won't be mixed in one batch.

Coordination, Inspection and preparatory Works

  • MEP clearances intention be secured.
  • Provision of floor drains, where applicable, will be guaranteed according to approved shop drawings.
  • Base work to get tiles will be examined earlier beginning fixing and installation of tile works and discrepancies regarding accuracy and suitability in location that may adversely affect installation and permanency of works, if any found, will be reported to consultant.
  • Before laying tiles it will be ensured that relevant setting out and shop drawings are approved by consultant. Provide symmetry about middle lines of the area and adjust to reduce tile cutting.
  • Tiling need to stay started out of the start point as much fixed about the approved shop drawing.
  • Lay out tile work so tiles not exactly ½ full sizes don’t happen and with least of cutting. Carefully grind edges of cut tile. Ensure cut tiles are in corners and are equivalent on each divider confront. It will be ensured that there are no unintended colours or shade variations inside the tiles for utilised as a part of every area according to endorsed measurements and relevant approved Material Approval Requests.

Mock-up construction

  • Mock-ups for each type on Consultant distinguished area will be installed for consultant’s endorsement, preceding begin development of real works accordingly.
  • Actual works will be completed as per consultant endorsed mock-up.
  • Approved mock up may stay as a component of the finished works.

Substrate Preparation of floors

Get a custom paper now from our expert writers.

  • Cast in place concrete substrate shall be adequately smooth and level such that when thin set mortar to accept tiles is applied.
  • Grind off high spots and fill in low spots as important to guarantee no void happens.
  • All toilets and pantries where to get waterproofing, apply waterproofing preceding establishment of tiles following the detail as shown on the relevant approved drawings.

Setting out and installation of tiles

  • Mix bedding or adhesive materials thoroughly as approved to a uniform consistency in an appropriate forced action according to manufacturer’s suggestions.
  • For installation of ceramic, porcelain and agglomerate tiles as required by endorsed shop drawings or finishing schedule.
  • Only the approved tile adhesive or mortars will be connected to substrate and backside of the tiles according to manufacturer’s suggestions.
  • The laying and settling of tiles will be begin from the area set apart on the approved shop drawing and specified as “Start Point”.
  • Tiles will be laid in arranged region to give true and consistent appearance to tiles and joints keep up the desired level as appeared on the approved drawings. Tiles will be settled as per approved setting out drawing.
  • Level marks will be given and set out up to complete level according to surveyor’s marking based on the drawings.
  • Tiles will be fixed in place and pressed firmly with twisting or sliding action to give finished bed thickness inside as far as possible as characterized in specifications and drawings.
  • Installation will be in way to guarantee that no voids under the tiles happen.
  • It will be guaranteed that joints are consistent with line, continuous and without steps.
  • The joint width will be 2mm or should be determined according to manufacturer’s suggestions and the grouting materials.
  • Ensure joints in skirting and joints between walls and floors are constant and match alignment. The supply and laying, fixing or installation of the different sorts of floor and skirting finishes will be appeared on the approved shop drawings.
  • The materials used for each sort of floor and skirting finishes should be approved by the consultant.
  • Provide control joint at least 6mm width in large tile zone at a maximum of 4.5m toward every path and at the perimeter wall. Try not to saw cut joints after installing tiles. Movement joints shall be located as required and be brought through backing to the structural wall, partially fill with strip and finish flush with sealant to the manufacturer’s suggestion.
  • The tiles will be fixed intently to electrical outlets, piping, fixtures and other penetrations so plates, collars or covers overlap tile. The tile work will be reached out into breaks and under or behind equipment and fixtures to form a complete covering without interruptions, unless otherwise indicated and will be terminated neatly at obstacles, edges and corners without disrupting pattern or joint alignments.
  • Pre-mould corner pieces shall be provided for all right angle corners ad per approved shop drawing.
  • Surfaces will be sloped consistently where demonstrates or requires by drawings.
  • Tile floors should be done flush with gratings, strainers and drains, where applicable and as appeared on the drawings.
  • Cutting round hole on tiles
Image of Prof. Linda Burke
This essay was reviewed by
Prof. Linda Burke

Cite this Essay

Hod Statement for installation of floor tiles (Ceramic, Porcelain & Agglomerate). (2019, February 27). GradesFixer. Retrieved November 12, 2024, from https://gradesfixer.com/free-essay-examples/hod-statement-for-installation-of-floor-tiles-ceramic-porcelain-agglomerate/
“Hod Statement for installation of floor tiles (Ceramic, Porcelain & Agglomerate).” GradesFixer, 27 Feb. 2019, gradesfixer.com/free-essay-examples/hod-statement-for-installation-of-floor-tiles-ceramic-porcelain-agglomerate/
Hod Statement for installation of floor tiles (Ceramic, Porcelain & Agglomerate). [online]. Available at: <https://gradesfixer.com/free-essay-examples/hod-statement-for-installation-of-floor-tiles-ceramic-porcelain-agglomerate/> [Accessed 12 Nov. 2024].
Hod Statement for installation of floor tiles (Ceramic, Porcelain & Agglomerate) [Internet]. GradesFixer. 2019 Feb 27 [cited 2024 Nov 12]. Available from: https://gradesfixer.com/free-essay-examples/hod-statement-for-installation-of-floor-tiles-ceramic-porcelain-agglomerate/
copy
Keep in mind: This sample was shared by another student.
  • 450+ experts on 30 subjects ready to help
  • Custom essay delivered in as few as 3 hours
Write my essay

Still can’t find what you need?

Browse our vast selection of original essay samples, each expertly formatted and styled

close

Where do you want us to send this sample?

    By clicking “Continue”, you agree to our terms of service and privacy policy.

    close

    Be careful. This essay is not unique

    This essay was donated by a student and is likely to have been used and submitted before

    Download this Sample

    Free samples may contain mistakes and not unique parts

    close

    Sorry, we could not paraphrase this essay. Our professional writers can rewrite it and get you a unique paper.

    close

    Thanks!

    Please check your inbox.

    We can write you a custom essay that will follow your exact instructions and meet the deadlines. Let's fix your grades together!

    clock-banner-side

    Get Your
    Personalized Essay in 3 Hours or Less!

    exit-popup-close
    We can help you get a better grade and deliver your task on time!
    • Instructions Followed To The Letter
    • Deadlines Met At Every Stage
    • Unique And Plagiarism Free
    Order your paper now