close
test_template

The Details of a Construction Project

download print

About this sample

About this sample

close

Words: 631 |

Page: 1|

4 min read

Published: Nov 16, 2018

Words: 631|Page: 1|4 min read

Published: Nov 16, 2018

Table of contents

  1. Types of claims
  2. Differing Site Conditions
    Delays, Disruptions, Acceleration and Other Time Related

Types of claims

There are several types of claims that occur during a lifecycle of a construction project. Typically, these claims can be classified into three main categories:

'Why Violent Video Games Shouldn't Be Banned'?

  • Changes in the scope of work.
  • Change of work order claims
  • Extra item and variation claims
  • Damage claims
  • Differing site conditions.
  • Time-related problems.
  • Excusable delay claims
  • Non excusable delay claims
  • Acceleration claims

Nearly, every construction project encounters change. A change can either be a revision of specifications, impact to the means and methods of performing work, more adequacies to the design or so on (Shah, Bhatt, & Bhavsar, 2014). These changes can have a different impact on the project from different stakeholder’s prospect.

From a contractor’s point of view, these changes delay and disrupt the workflow and intended schedule of the project. Since, changes increase and decrease the quality of the project contractor requires increased rates or extra money for completing the work. In this condition, a possibility of a claim arises between the contractor and client. In addition to this, change orders typically request for more adequacy in the design, whether it be by owner or the contractor. This provokes a defensive nature for design engineers causing more disputes.

Moreover, change also refers to any additional work required by the owner after the construction has started. Since, this extra work was not originally included in the contract. The contractor claims that there is a change in contract. While the owner believes that it was originally a part of the contract. This disagreement also leads to a clause between owner and contractor (Shah, Bhatt, & Bhavsar, 2014).

Differing Site Conditions

In almost every project, the nature and condition of the physical aspects and site is briefly described in the contract documents. However, in some cases those site conditions fail to meet with the written description. Because of these changed conditions, workflow of the project gets disrupted along with a risk of increased cost and timeframe. In such situations, a claim becomes inevitable between the owner and contractor. Besides this, situations also arise where contractor is encountered with unknown physical site conditions, of an unusual nature. Such as, a rock that was supposed to fracture did not fracture as expected or unusual moisture conditions of soil.

Delays, Disruptions, Acceleration and Other Time Related

In construction industry, most frequently occurring claims arise due to the delays and disruptions of the intended schedule (Shah, Bhatt, & Bhavsar, 2014). According to Gibson, extension of time submissions are the most common source of construction disputes (Gibson, 2008). Delay claims refers to the unforeseen circumstances which extend the planned duration of the project. These delays can be caused by the contractor, the owner, third parties, or by unanticipated natural or artificial site conditions. One this basis, delay claims can be classified as excusable and non-excusable delays.

Excusable delays are those where the contractor is not held accountable for delay. These delays arise from unexpected circumstances that are beyond the control and include no fault or negligence of the contractor such as design problems, unforeseen severe weather, unexpected strikes etc. On the other hand, non-excusable delays are those where the contractor can be held accountable. In this case, the circumstances occurred are foreseeable and can be managed regardless of the fact that the contractor has control over the occurrence or not. For this, contractor is required to efficiently plan the project considering the unavoidable circumstances. If not, then the contractor can be held accountable.

Get a custom paper now from our expert writers.

In addition to this, there are many potential disruptive events that have an impact on the planned sequence of the project. For example, the owner fails to provide whole site access to contractor, obtain permits and right-of-ways, or fails to coordinate work with other contractors.

Image of Prof. Linda Burke
This essay was reviewed by
Prof. Linda Burke

Cite this Essay

The Details of a Construction Project. (2018, November 15). GradesFixer. Retrieved April 19, 2024, from https://gradesfixer.com/free-essay-examples/the-details-of-a-construction-project/
“The Details of a Construction Project.” GradesFixer, 15 Nov. 2018, gradesfixer.com/free-essay-examples/the-details-of-a-construction-project/
The Details of a Construction Project. [online]. Available at: <https://gradesfixer.com/free-essay-examples/the-details-of-a-construction-project/> [Accessed 19 Apr. 2024].
The Details of a Construction Project [Internet]. GradesFixer. 2018 Nov 15 [cited 2024 Apr 19]. Available from: https://gradesfixer.com/free-essay-examples/the-details-of-a-construction-project/
copy
Keep in mind: This sample was shared by another student.
  • 450+ experts on 30 subjects ready to help
  • Custom essay delivered in as few as 3 hours
Write my essay

Still can’t find what you need?

Browse our vast selection of original essay samples, each expertly formatted and styled

close

Where do you want us to send this sample?

    By clicking “Continue”, you agree to our terms of service and privacy policy.

    close

    Be careful. This essay is not unique

    This essay was donated by a student and is likely to have been used and submitted before

    Download this Sample

    Free samples may contain mistakes and not unique parts

    close

    Sorry, we could not paraphrase this essay. Our professional writers can rewrite it and get you a unique paper.

    close

    Thanks!

    Please check your inbox.

    We can write you a custom essay that will follow your exact instructions and meet the deadlines. Let's fix your grades together!

    clock-banner-side

    Get Your
    Personalized Essay in 3 Hours or Less!

    exit-popup-close
    We can help you get a better grade and deliver your task on time!
    • Instructions Followed To The Letter
    • Deadlines Met At Every Stage
    • Unique And Plagiarism Free
    Order your paper now